Discovery Kids Daisy Projection Alarm Clock

Discovery Kids Daisy Projection Alarm Clock Owners Manuals, User Guides, Instructional Help Documents & Operating Information - DEANRYANS%20fillable%20CONTRACT%2009.pdf

Report DMCA / Copyright

DOWNLOAD PDF

  • 260KB
  • 2 Pages
  • 612 x 792 pts (letter)
  • 41 Downloads
  • 395 Views

 

Citation

Snow Removal Service 900 Greenbank Road, Suite 618 Ottawa K2J 4P6 Tel. (613) 825-7913 www.deanryans.com (Please Print) This contract is between Dean Ryan’s Contracting and the Client, ______________________ at the residence of ___________________________ Postal Code__________, for the winter season commencing November 1/09 to March 31/10. We will plough snow with an accumulation of 5 cm or more per snowfall. There will be a limit of 250 centimeters per season. Duties include: • Ploughing of the Driveway • Ploughing snow onto grass at the end of driveway; • Salt and sand is not included, but can be supplied upon request for an additional fee. Rate Schedule: before November 21st, 2009 • Single Car Driveway: $325.00 + $16.25 = Total $341.25 -or- 2 payments of $170.62 each • Double Car Driveway: $350.00 + $17.50 = Total $367.50 -or- 2 payments of $183.75 each • Shared Car Driveway: $250.00 + $12.50 = Total $262.50 -or- 2 payments of $131.25 each Payment Schedule: • CHEQUE: Upon acceptance of the contract, 50% immediately and the remainder by post dated cheque, dated before December 31st, 2009. • CREDIT CARD: Visa or Mastercard, payment in full when contract is accepted. TOTAL INCLUDING G.S.T.______________________. EXPIRY DATE

CREDIT CARD #

Free lawn Aeration in the Spring payment must be received before October 21st, 2009 (front lawn only) Acceptance: For any snowfall that is under 10 cm accumulation, ploughing will commence only once snowfall has ended or City trucks have started ploughing the streets. We are not responsible for any snow that is blown onto the driveway by winds. Also, we are not responsible for any damages caused to interlocking stone, or scratches to paved driveways.

Date:_________________

by Dean Ryan’s Contracting:_________________________

Date:_________________

by Customer signature:_____________________________

Customer Tel.# (w)___________________#(h)____________________Email:___________________

NOTE, after November 21st, 2009, our rates are: Single $375.00 + $18.75 GST, Total $393.75 Double $425.00 + $21.25 GST, Total $446.25

• Please see information on reverse •

Single Car Driveway: a driveway which can park cars ‘end on’ only. Double Car Driveway: a driveway which can park 2 cars beside each other. Triple Car Driveway: a driveway which can park 3 cars beside each other. Shared Driveway: a driveway connected to your neighbour and can park cars ‘end on’ on your property only.

A Friendly Reminder.....things to do for the upcoming season. • Leave outside lights on so the house numbers are visible. • On garbage days, do not put garbage on laneway or on the side of the lane where snow is pushed. • Contact numbers are only for emergencies, the more times we are paged and have to respond, the longer it takes to get our job done. • Vehicles that stay in the laneway are to be parked close to the garage and preferably to one side. • Please mark laneway with wood sticks two feet high (not steel). • If you get your sidewalk shoveled, it will not be done until all other work is completed. Adhering to these expectations enables us to be more efficient and serve you to the best of our capabilities. Thanking you in advance for your cooperation, DeanRyan’s